Overestimate One Heuristic
Setup: Run the preloaded graph with S as the start and G as the goal, and note the path and total cost.
Action: Change the heuristic of node C from 5 to 20, then run Find Optimal Path again.
What to Observe: Compare the final path and cost with the first run, and check how the changed heuristic affects the order in which nodes are considered.
Takeaway: An overestimated heuristic can make a promising node look more expensive than it really is, causing A* to choose a more expensive route. Optimality depends on an admissible heuristic.